Project: I-CAVS   -  
            Listing of Entries
    (Please mouse-over any icon to get a description of that function).


  
Builder Name:paolo cavosi   -  
Project:   Vans - RV-10
Total Hours:2429.2
Total Flight Time:
Start/Last Date:May 28, 2019 - No Finish Date
Engine:IO-540 Thunderbolt Serial # EL-38135-48E
Propeller:MT Propeller MTV-12-B/193-53 serial 22G1268-K
Panel:Garmin G3X
 
Friendly URL: https://eaabuilderslog.org?s=I-CAVS

Home or Last Project Picture

Apr 17, 2023     Firewall Insulation - (4 hours)       Category: Firewall
Cut the fiberfrax to measure. cut the stainless steel foil to measure. Positioned the foil and drilled the holes using the recess screw holes.
Installed the spherical firewall fitting flange and matchdrilled.
After sandwiching the fiberfrax and steel foil between the spherical firewall fitting flanges i used a cutter to create the hole for the ball passthrough.
Trimmed the fiberfrax and stainless foil.


 


NOTE: This information is strictly used for the EAA Builders Log project within the EAA organization.     -     Policy     -     © Copyright 2024 Brevard Web Pro, Inc.